Cabana on 12th

  • Date: 2019
  • Contractor: Greenlight General Contractor
  • Products Used: Gypcrete 2000, ¼ Acousti Mat, Galvanized L-Flashing, 90 mil Fluid applied waterproofing, Hardrock

About this Project

This project is located in Phoenix, AZ. When this project was finished, the total contract amount was over $500,000. The Arizona team completed over 100,000 square feet within five different buildings. We installed Gypcrete and Acousti Mat on the second and third-floor units. Then we installed flashing, waterproofing, and concrete in ten exterior corridors on the same floors.

Sound Crete Obsidian Mountain- Henderson