  • Date: 2018
  • Contractor: Beal Derkenne Construction
  • Products Used: Excel-Coat

About this Project

This project consisted of roughly 5,000 square feet of exterior breezeways on the third and fourth floors. As a team, we installed Excel-Coat over concrete and plywood. This took a total of five production pour days.

HUB-III-Tucson-2